Roboman Solar

ERCOT queue ID 27INR0453

Queue ID27INR0453
Project nameRoboman Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap (#) Twin Buttes – (#) Divide Ckt 1
Point of interconnectionTap 345 kV (#76009) Twin Buttes – (#76090) Divide Ckt 1
CountyCoke
StateTX
Voltage345 kV
Capacity272.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-07-01
Source datasetlarge

Additional filed fields

Interconnecting EntityRoboman Solar, LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Screening Study Complete45930
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.