Bluebonnet Trail Solar

ERCOT queue ID 27INR0417

Bluebonnet Trail Solar (27INR0417) is listed in the ERCOT interconnection queue as a 150.9 MW solar project in Ellis County, TX. The filing names Tap (#) WATMLL_W5 - (#) BIGONION_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of September 19, 2028. It records the screening study as complete on March 17, 2025 and the full interconnection study as approved on July 30, 2026.

Queue ID27INR0417
Project nameBluebonnet Trail Solar
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap (#) WATMLL_W5 - (#) BIGONION_5
Point of interconnectionTap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5
CountyEllis
StateTX
Voltage345 kV
Capacity150.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-09-19
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBluebonnet trail solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2025-03-17
Full interconnection study approved2026-07-30
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.