Baker Branch BESS
ERCOT queue ID 27INR0409
Baker Branch BESS (27INR0409) is listed in the ERCOT interconnection queue as a 287.2 MW battery project in Lamar County, TX. The filing names Pacific Switch (PACSW) Bus as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on September 11, 2025.
| Queue ID | 27INR0409 |
|---|---|
| Project name | Baker Branch BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Pacific Switch (PACSW) Bus |
| Point of interconnection | Pacific Switch (PACSW) 345 kV Bus 11683 |
| County | Lamar |
| State | TX |
| Voltage | 345 kV |
| Capacity | 287.2 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Mockingbird Storage Center, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2025-09-11 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.