Johnson Grass Solar
ERCOT queue ID 27INR0348
Johnson Grass Solar (27INR0348) is listed in the ERCOT interconnection queue as a 195.8 MW solar project in Mitchell County, TX. The filing names Tap (#) Navigation - (#) Cattlemen as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 19, 2028. It records the screening study as complete on December 9, 2024.
| Queue ID | 27INR0348 |
|---|---|
| Project name | Johnson Grass Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap (#) Navigation - (#) Cattlemen |
| Point of interconnection | Tap 138kV (#11395) Navigation - (#10054) Cattlemen |
| County | Mitchell |
| State | TX |
| Voltage | 138 kV |
| Capacity | 195.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-04-19 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Johnson Grass Solar ,LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2024-12-09 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.