Sunflower Valley Storage
ERCOT queue ID 27INR0327
Sunflower Valley Storage (27INR0327) is listed in the ERCOT interconnection queue as a 205.7 MW battery project in Mitchell County, TX. The filing names Champion Creek Substation as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 17, 2029. It records the screening study as complete on July 22, 2025.
| Queue ID | 27INR0327 |
|---|---|
| Project name | Sunflower Valley Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Champion Creek Substation |
| Point of interconnection | 1414 Champion Creek Substation 345 kV |
| County | Mitchell |
| State | TX |
| Voltage | 345 kV |
| Capacity | 205.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-04-17 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Sunflower Valley Storage, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2025-07-22 |
| Air permit | Not Required |
| Water availability | 2025-09-15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.