Solar Star Bay City Storage
ERCOT queue ID 27INR0120
Solar Star Bay City Storage (27INR0120) is listed in the ERCOT interconnection queue as a 206.3 MW battery project in Matagorda County, TX. The filing names Tap Conoco (#) – Black Cat (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 27, 2029. It records the screening study as complete on March 11, 2024.
| Queue ID | 27INR0120 |
|---|---|
| Project name | Solar Star Bay City Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Conoco (#) – Black Cat (#) |
| Point of interconnection | Tap 138kV Conoco (#8138) – Black Cat (#80124) |
| County | Matagorda |
| State | TX |
| Voltage | 138 kV |
| Capacity | 206.3 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-02-27 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Solar Star Bay City Storage |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-03-11 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.