Substation Scout

Solar Star Bay City Storage

ERCOT queue ID 27INR0120

Solar Star Bay City Storage (27INR0120) is listed in the ERCOT interconnection queue as a 206.3 MW battery project in Matagorda County, TX. The filing names Tap Conoco (#) – Black Cat (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 27, 2029. It records the screening study as complete on March 11, 2024.

Queue ID27INR0120
Project nameSolar Star Bay City Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Conoco (#) – Black Cat (#)
Point of interconnectionTap 138kV Conoco (#8138) – Black Cat (#80124)
CountyMatagorda
StateTX
Voltage138 kV
Capacity206.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-02-27
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySolar Star Bay City Storage
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-03-11

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first