Malachite BESS
ERCOT queue ID 27INR0112
Malachite BESS (27INR0112) is listed in the ERCOT interconnection queue as a 191.1 MW battery project in Wharton County, TX. The filing names Tap Hillje – Holman as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of April 30, 2032. It records the screening study as complete on July 22, 2024, the full interconnection study as approved on November 4, 2025 and the interconnection agreement as signed on December 26, 2025.
| Queue ID | 27INR0112 |
|---|---|
| Project name | Malachite BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Hillje – Holman |
| Point of interconnection | Tap 345 kV 44200 Hillje – 9073 Holman |
| County | Wharton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 191.1 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2032-04-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Malachite Storage LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-12-26 |
| Screening study complete | 2024-07-22 |
| Full interconnection study approved | 2025-11-04 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.