Malachite Solar

ERCOT queue ID 27INR0111

Malachite Solar (27INR0111) is listed in the ERCOT interconnection queue as a 184.6 MW solar project in Wharton County, TX. The filing names The Hillje (#) – Holman (#) Line; AEN. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of April 30, 2032. It records the screening study as complete on May 22, 2024, the full interconnection study as approved on November 4, 2025 and the interconnection agreement as signed on December 26, 2025.

Queue ID27INR0111
Project nameMalachite Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationThe Hillje (#) – Holman (#) Line; AEN.
Point of interconnectionThe 345 kV Hillje (#44200) – Holman (#9073) Line; AEN.
CountyWharton
StateTX
Voltage345 kV
Capacity184.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2032-04-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMalachite Solar LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-12-26
Screening study complete2024-05-22
Full interconnection study approved2025-11-04
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.