Pecan BESS
ERCOT queue ID 27INR0092
Pecan BESS (27INR0092) is listed in the ERCOT interconnection queue as a 157.1 MW battery project in Leon County, TX. The filing names (PSSE BUS# 47) HILTOPLKS8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on January 22, 2024 and the full interconnection study as approved on July 29, 2025.
| Queue ID | 27INR0092 |
|---|---|
| Project name | Pecan BESS |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | (PSSE BUS# 47) HILTOPLKS8 |
| Point of interconnection | (PSSE BUS# 47) HILTOPLKS8 138kV |
| County | Leon |
| State | TX |
| Voltage | 138 kV |
| Capacity | 157.1 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Leon, TX: 14 requests in the ERCOT queue, 13 active totaling 6,147.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Gransolar Texas Three LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-01-22 |
| Full interconnection study approved | 2025-07-29 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.