Sandow Lakes Energy Station
ERCOT queue ID 27INR0071
Sandow Lakes Energy Station (27INR0071) is listed in the ERCOT interconnection queue as a 1,291.6 MW gas project in Milam County, TX. The filing names # Sandow Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 1, 2028. It records the screening study as complete on June 19, 2024.
| Queue ID | 27INR0071 |
|---|---|
| Project name | Sandow Lakes Energy Station |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | # Sandow Switch |
| Point of interconnection | #13430 Sandow Switch 138kV |
| County | Milam |
| State | TX |
| Voltage | 138 kV |
| Capacity | 1,291.6 MW |
| Resource (as published) | GAS/GT |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2028-04-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | SL Energy Power Plant I, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | GAS |
| Technology code | GT |
| Screening study complete | 2024-06-19 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.