Substation Scout

Sandow Lakes Energy Station

ERCOT queue ID 27INR0071

Sandow Lakes Energy Station (27INR0071) is listed in the ERCOT interconnection queue as a 1,291.6 MW gas project in Milam County, TX. The filing names # Sandow Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 1, 2028. It records the screening study as complete on June 19, 2024.

Queue ID27INR0071
Project nameSandow Lakes Energy Station
Status (as published)SS Completed, FIS Started, No IA
Substation# Sandow Switch
Point of interconnection#13430 Sandow Switch 138kV
CountyMilam
StateTX
Voltage138 kV
Capacity1,291.6 MW
Resource (as published)GAS/GT
Resource categoryGas (normalized for filtering)
Target commercial operation2028-04-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySL Energy Power Plant I, LLC
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeGT
Screening study complete2024-06-19

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.