Solar Star Rhome Storage

ERCOT queue ID 27INR0040

Solar Star Rhome Storage (27INR0040) is listed in the ERCOT interconnection queue as a 226.2 MW battery project in Wise County, TX. The filing names 576 RHOME as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of September 27, 2029. It records the screening study as complete on July 12, 2023 and the full interconnection study as approved on July 21, 2025.

Queue ID27INR0040
Project nameSolar Star Rhome Storage
Status (as published)SS Completed, FIS Completed, No IA
Substation576 RHOME
Point of interconnection576 RHOME 138kV
CountyWise
StateTX
Voltage138 kV
Capacity226.2 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-09-27
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wise, TX: 11 requests in the ERCOT queue, 10 active totaling 3,798 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySolar Star Rhome Storage
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2023-07-12
Full interconnection study approved2025-07-21

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.