Pavlov BESS2

ERCOT queue ID 26INR0714

Pavlov BESS2 (26INR0714) is listed in the ERCOT interconnection queue as a 10 MW battery project in Matagorda County, TX. The filing names New DESR on the coordinates above tie at to: TSP Station Name: Pavlov TSP as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of December 25, 2026. It records the interconnection agreement as signed on June 18, 2025.

Queue ID26INR0714
Project namePavlov BESS2
Status (as published)In Queue
SubstationNew DESR on the coordinates above tie at to: TSP Station Name: Pavlov TSP
Point of interconnectionNew DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Pavlov TSP Station Code: PAVLOV Load Name: 138_13_1 Bus #: PTI Bus Number: 8608 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01
CountyMatagorda
StateTX
Voltage12.5 kV
Capacity10 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-12-25
Source datasetsmall

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMatagorda Clean Energy Center, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-06-18

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.