Pavlov BESS2
ERCOT queue ID 26INR0714
Pavlov BESS2 (26INR0714) is listed in the ERCOT interconnection queue as a 10 MW battery project in Matagorda County, TX. The filing names New DESR on the coordinates above tie at to: TSP Station Name: Pavlov TSP as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of December 25, 2026. It records the interconnection agreement as signed on June 18, 2025.
| Queue ID | 26INR0714 |
|---|---|
| Project name | Pavlov BESS2 |
| Status (as published) | In Queue |
| Substation | New DESR on the coordinates above tie at to: TSP Station Name: Pavlov TSP |
| Point of interconnection | New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Pavlov TSP Station Code: PAVLOV Load Name: 138_13_1 Bus #: PTI Bus Number: 8608 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01 |
| County | Matagorda |
| State | TX |
| Voltage | 12.5 kV |
| Capacity | 10 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-12-25 |
| Source dataset | small |
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Matagorda Clean Energy Center, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-06-18 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.