Aquila Solar

ERCOT queue ID 26INR0635

Aquila Solar (26INR0635) is listed in the ERCOT interconnection queue as a 520 MW solar project in Milam County, TX. The filing names Gibson Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 15, 2029. It records the screening study as complete on January 19, 2026.

Queue ID26INR0635
Project nameAquila Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationGibson Switch
Point of interconnection3706 Gibson Switch 345kV
CountyMilam
StateTX
Voltage345 kV
Capacity520 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-02-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Capacity revised +20 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityBen Milam Solar 5
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2026-01-19
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.