Aquila Solar
ERCOT queue ID 26INR0635
Aquila Solar (26INR0635) is listed in the ERCOT interconnection queue as a 520 MW solar project in Milam County, TX. The filing names Gibson Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 15, 2029. It records the screening study as complete on January 19, 2026.
| Queue ID | 26INR0635 |
|---|---|
| Project name | Aquila Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Gibson Switch |
| Point of interconnection | 3706 Gibson Switch 345kV |
| County | Milam |
| State | TX |
| Voltage | 345 kV |
| Capacity | 520 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-02-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | +20 | SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Ben Milam Solar 5 |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2026-01-19 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.