Substation Scout

Dempsey Solar SLF

ERCOT queue ID 26INR0632

Dempsey Solar SLF (26INR0632) is listed in the ERCOT interconnection queue as a 245.3 MW solar project in Leon County, TX. The filing names Tap Ridge (#37)-Robertson (#32) line; BEPC as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 8, 2028. It records the screening study as complete on May 20, 2025.

Queue ID26INR0632
Project nameDempsey Solar SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Ridge (#37)-Robertson (#32) line; BEPC
Point of interconnectionTap 138 KV Ridge (#37)-Robertson (#32) line; BEPC
CountyLeon
StateTX
Voltage138 kV
Capacity245.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-09-08
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Leon, TX: 14 requests in the ERCOT queue, 13 active totaling 6,147.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityDempsey Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2025-05-20
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first