Betel Storage I
ERCOT queue ID 26INR0630
Betel Storage I (26INR0630) is listed in the ERCOT interconnection queue as a 500 MW battery project in Milam County, TX. The filing names Little Pond Switch ( LTPSW) 345 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of August 12, 2026. It records the screening study as complete on April 15, 2025.
| Queue ID | 26INR0630 |
|---|---|
| Project name | Betel Storage I |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Little Pond Switch ( LTPSW) 345 |
| Point of interconnection | 3377 Little Pond Switch ( LTPSW) 345 |
| County | Milam |
| State | TX |
| Voltage | Not reported |
| Capacity | 500 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-08-12 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BETEL STORAGE I |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2025-04-15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.