ERCOT queue ID 26INR0630

Betel Storage I (26INR0630) is listed in the ERCOT interconnection queue as a 500 MW battery project in Milam County, TX. The filing names Little Pond Switch ( LTPSW) 345 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of August 12, 2026. It records the screening study as complete on April 15, 2025.

Queue ID26INR0630
Project nameBetel Storage I
Status (as published)SS Completed, FIS Started, No IA
SubstationLittle Pond Switch ( LTPSW) 345
Point of interconnection3377 Little Pond Switch ( LTPSW) 345
CountyMilam
StateTX
VoltageNot reported
Capacity500 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-08-12
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBETEL STORAGE I
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-04-15

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first