Scorpius Solar

ERCOT queue ID 26INR0609

Scorpius Solar (26INR0609) is listed in the ERCOT interconnection queue as a 600 MW solar project in Milam County, TX. The filing names LTPSW as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2029. It records the screening study as complete on March 3, 2025.

Queue ID26INR0609
Project nameScorpius Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationLTPSW
Point of interconnection3377 LTPSW 345KV
CountyMilam
StateTX
Voltage345 kV
Capacity600 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBen Milam Solar 4
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2025-03-03
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.