Lightning Ridge Energy Storage

ERCOT queue ID 26INR0460

Lightning Ridge Energy Storage (26INR0460) is listed in the ERCOT interconnection queue as a 204.7 MW battery project in Jack County, TX. The filing names Tap # Jacksboro Substation as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of March 21, 2028. It records the screening study as complete on June 25, 2024 and the full interconnection study as approved on November 24, 2025.

Queue ID26INR0460
Project nameLightning Ridge Energy Storage
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap # Jacksboro Substation
Point of interconnectionTap #1429 Jacksboro Substation 345kV
CountyJack
StateTX
Voltage345 kV
Capacity204.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-03-21
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Jack, TX: 18 requests in the ERCOT queue, 17 active totaling 7,978.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLightning Ridge Storage LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2024-06-25
Full interconnection study approved2025-11-24

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.