Whitetail BESS
ERCOT queue ID 26INR0420
Whitetail BESS (26INR0420) is listed in the ERCOT interconnection queue as a 180 MW battery project in Mitchell County, TX. The filing names tap Salt Mine (#) to Bulldog (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 8, 2029. It records the screening study as complete on May 24, 2024.
| Queue ID | 26INR0420 |
|---|---|
| Project name | Whitetail BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap Salt Mine (#) to Bulldog (#) |
| Point of interconnection | tap Salt Mine (#23846) to Bulldog (#23833) 138kV |
| County | Mitchell |
| State | TX |
| Voltage | 138 kV |
| Capacity | 180 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-06-08 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Hunt Energy Network, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-05-24 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.