Substation Scout

Uva Creek Solar

ERCOT queue ID 26INR0359

Uva Creek Solar (26INR0359) is listed in the ERCOT interconnection queue as a 302.2 MW solar project in Borden County, TX. The filing names Muleshoe # as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of August 25, 2028. It records the screening study as complete on May 20, 2024 and the interconnection agreement as signed on October 30, 2024.

Queue ID26INR0359
Project nameUva Creek Solar
Status (as published)SS Completed, FIS Started, IA
SubstationMuleshoe #
Point of interconnectionMuleshoe #59922 345 KV
CountyBorden
StateTX
Voltage345 kV
Capacity302.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-08-25
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGrape Creek Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2024-10-30
Screening study complete2024-05-20
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.