Substation Scout

Edens Solar

ERCOT queue ID 26INR0313

Edens Solar (26INR0313) is listed in the ERCOT interconnection queue as a 70.8 MW solar project in Hill County, TX. The filing names Tap Itasca - Hillsboro as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 9, 2028. It records the screening study as complete on January 22, 2024.

Queue ID26INR0313
Project nameEdens Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Itasca - Hillsboro
Point of interconnectionTap 69kV 3532 Itasca - 3523 Hillsboro
CountyHill
StateTX
Voltage69 kV
Capacity70.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-04-09
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHill PV, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2024-01-22
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first