Beitel Energy Storage

ERCOT queue ID 26INR0185

Beitel Energy Storage (26INR0185) is listed in the ERCOT interconnection queue as a 200.6 MW battery project in Jack County, TX. The filing names 579 Jack County as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2029. It records the screening study as complete on November 10, 2023.

Queue ID26INR0185
Project nameBeitel Energy Storage
Status (as published)SS Completed, FIS Started, No IA
Substation579 Jack County
Point of interconnection579 Jack County 138kV
CountyJack
StateTX
Voltage138 kV
Capacity200.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-06-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Jack, TX: 18 requests in the ERCOT queue, 17 active totaling 7,978.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBrazos Energy Storage, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2023-11-10
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.