Falcon Zapata Storage 138
ERCOT queue ID 26INR0116
Falcon Zapata Storage 138 (26INR0116) is listed in the ERCOT interconnection queue as a 200.8 MW battery project in Zapata County, TX. The filing names Tap Zapata - Lopeno as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of March 11, 2028. It records the screening study as complete on August 11, 2023 and the interconnection agreement as signed on February 3, 2026.
| Queue ID | 26INR0116 |
|---|---|
| Project name | Falcon Zapata Storage 138 |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Zapata - Lopeno |
| Point of interconnection | Tap 138kV 8299 Zapata - 8957 Lopeno |
| County | Zapata |
| State | TX |
| Voltage | 138 kV |
| Capacity | 200.8 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-03-11 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Falcon BESS, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2026-02-03 |
| Screening study complete | 2023-08-11 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.