Douie Solar

ERCOT queue ID 26INR0098

Douie Solar (26INR0098) is listed in the ERCOT interconnection queue as a 221.2 MW solar project in Freestone County, TX. The filing names Tap Sea way Teague - Jewett as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of April 18, 2028. It records the screening study as complete on August 11, 2023, the full interconnection study as approved on July 7, 2025 and the interconnection agreement as signed on March 8, 2026.

Queue ID26INR0098
Project nameDouie Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Sea way Teague - Jewett
Point of interconnectionTap 138 kV 3501 Sea way Teague - 3394 Jewett
CountyFreestone
StateTX
Voltage138 kV
Capacity221.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-04-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBuffalo Spring Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2026-03-08
Screening study complete2023-08-11
Full interconnection study approved2025-07-07
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.