Anila Solar

ERCOT queue ID 26INR0074

Anila Solar (26INR0074) is listed in the ERCOT interconnection queue as a 200.8 MW solar project in Wilson County, TX. The filing names Tap Elm Creek - San Miguel Gen Ckt 1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of September 30, 2028. It records the screening study as complete on April 28, 2023, the full interconnection study as approved on July 10, 2024 and the interconnection agreement as signed on March 6, 2025.

Queue ID26INR0074
Project nameAnila Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Elm Creek - San Miguel Gen Ckt 1
Point of interconnectionTap 345kV 5133 Elm Creek - 5901 San Miguel Gen Ckt 1
CountyWilson
StateTX
Voltage345 kV
Capacity200.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wilson, TX: 18 requests in the ERCOT queue, 15 active totaling 3,532.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAlina Energy LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-03-06
Screening study complete2023-04-28
Full interconnection study approved2024-07-10
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.