Fairway Storage

ERCOT queue ID 26INR0033

Fairway Storage (26INR0033) is listed in the ERCOT interconnection queue as a 120.3 MW battery project in Freestone County, TX. The filing names Tap FAIRWPOD_8 - 196 FAIRFIELD as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of September 24, 2027. It records the screening study as complete on February 4, 2023 and the interconnection agreement as signed on August 11, 2025.

Queue ID26INR0033
Project nameFairway Storage
Status (as published)SS Completed, FIS Started, IA
SubstationTap FAIRWPOD_8 - 196 FAIRFIELD
Point of interconnectionTap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD
CountyFreestone
StateTX
Voltage138 kV
Capacity120.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-09-24
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFairway Storage LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-08-11
Screening study complete2023-02-04
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.