Knapp BESS
ERCOT queue ID 25INR0747
Knapp BESS (25INR0747) is listed in the ERCOT interconnection queue as a 10 MW battery project in Scurry County, TX. The filing names Station Name: KNAPP as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of October 24, 2026. It records the interconnection agreement as signed on March 13, 2025.
| Queue ID | 25INR0747 |
|---|---|
| Project name | Knapp BESS |
| Status (as published) | In Queue |
| Substation | Station Name: KNAPP |
| Point of interconnection | Station Name: KNAPP Station Code: KNAPP Station Bus Number: #1310 Station Transmission Voltage: 138 kV Load/Load Transformer Name: LDLXFMR2 Distribution Voltage: 12.47 kV |
| County | Scurry |
| State | TX |
| Voltage | 138 kV |
| Capacity | 10 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-10-24 |
| Source dataset | small |
Same substation and county
Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Knapp ESS Assets, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-03-13 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.