Hollywood Solar Repower
ERCOT queue ID 25INR0741
Hollywood Solar Repower (25INR0741) is listed in the ERCOT interconnection queue as a 9.9 MW solar project in Wharton County, TX. The filing names BLU as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of December 30, 2026. It records the interconnection agreement as signed on October 21, 2025.
| Queue ID | 25INR0741 |
|---|---|
| Project name | Hollywood Solar Repower |
| Status (as published) | In Queue |
| Substation | BLU |
| Point of interconnection | 44060 BLU 345kV |
| County | Wharton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 9.9 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-12-30 |
| Source dataset | small |
Same substation and county
Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | RED TAILED HAWK SOLAR LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-10-21 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.