Hollywood Solar Repower (25INR0741) is listed in the ERCOT interconnection queue as a 9.9 MW solar project in Wharton County, TX. The filing names BLU as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of December 30, 2026. It records the interconnection agreement as signed on October 21, 2025.

Queue ID25INR0741
Project nameHollywood Solar Repower
Status (as published)In Queue
SubstationBLU
Point of interconnection44060 BLU 345kV
CountyWharton
StateTX
Voltage345 kV
Capacity9.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-30
Source datasetsmall

Same substation and county

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRED TAILED HAWK SOLAR LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-10-21

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first