Substation Scout

O'Bannion Energy Storage

ERCOT queue ID 25INR0657

O'Bannion Energy Storage (25INR0657) is listed in the ERCOT interconnection queue as a 306.4 MW battery project in Jack County, TX. The filing names Long Hollow Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of April 21, 2028. It records the screening study as complete on August 5, 2024, the full interconnection study as approved on May 2, 2025 and the interconnection agreement as signed on December 5, 2025.

Queue ID25INR0657
Project nameO'Bannion Energy Storage
Status (as published)SS Completed, FIS Completed, IA
SubstationLong Hollow Switch
Point of interconnection1506 Long Hollow Switch 345 kV
CountyJack
StateTX
Voltage345 kV
Capacity306.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-04-21
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Jack, TX: 18 requests in the ERCOT queue, 17 active totaling 7,978.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityO'Bannion Energy Storage, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-12-05
Screening study complete2024-08-05
Full interconnection study approved2025-05-02
Air permitNot Required
Water availability2026-01-12

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first