Jenna Eco-Electric Solar (25INR0632) is listed in the ERCOT interconnection queue as a 576.3 MW solar project in Fisher County, TX. The filing names Tap Tonkawa Switch - Graham SES as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 16, 2029. It records the screening study as complete on August 13, 2024 and the full interconnection study as approved on April 2, 2026.

Queue ID25INR0632
Project nameJenna Eco-Electric Solar
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap Tonkawa Switch - Graham SES
Point of interconnectionTap 345 kV 1048 Tonkawa Switch - 1430 Graham SES
CountyFisher
StateTX
Voltage345 kV
Capacity576.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-04-16
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Fisher, TX: 13 requests in the ERCOT queue, 13 active totaling 6,376 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityClean Energy Holdings, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2024-08-13
Full interconnection study approved2026-04-02
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first