Jenna Eco-Electric Solar
ERCOT queue ID 25INR0632
Jenna Eco-Electric Solar (25INR0632) is listed in the ERCOT interconnection queue as a 576.3 MW solar project in Fisher County, TX. The filing names Tap Tonkawa Switch - Graham SES as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 16, 2029. It records the screening study as complete on August 13, 2024 and the full interconnection study as approved on April 2, 2026.
| Queue ID | 25INR0632 |
|---|---|
| Project name | Jenna Eco-Electric Solar |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Tap Tonkawa Switch - Graham SES |
| Point of interconnection | Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES |
| County | Fisher |
| State | TX |
| Voltage | 345 kV |
| Capacity | 576.3 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-04-16 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Fisher, TX: 13 requests in the ERCOT queue, 13 active totaling 6,376 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Clean Energy Holdings, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2024-08-13 |
| Full interconnection study approved | 2026-04-02 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.