Pledger BESS

ERCOT queue ID 25INR0604

Pledger BESS (25INR0604) is listed in the ERCOT interconnection queue as a 9.5 MW battery project in Matagorda County, TX. The filing names 29., -95. CNP Pledger Substation LONG Name: PLEDGER Short Name: PG ERCOT Bus #: ERCOT Load Name: TR2 Connectivity Node: TR2 as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of December 25, 2026. It records the interconnection agreement as signed on April 29, 2024.

Queue ID25INR0604
Project namePledger BESS
Status (as published)In Queue
Substation29., -95. CNP Pledger Substation LONG Name: PLEDGER Short Name: PG ERCOT Bus #: ERCOT Load Name: TR2 Connectivity Node: TR2
Point of interconnection29.188382, -95.911558 CNP Pledger Substation LONG Name: PLEDGER Short Name: PG ERCOT Bus #: 43120 ERCOT Load Name: TR2 Connectivity Node: TR2
CountyMatagorda
StateTX
VoltageNot reported
Capacity9.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-12-25
Source datasetsmall

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRegis Pledger LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-04-29

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.