Indigo solar 2

ERCOT queue ID 25INR0547

Indigo solar 2 (25INR0547) is listed in the ERCOT interconnection queue as a 180 MW solar project in Fisher County, TX. The filing names Tap Clayton - WShack Ckt 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 15, 2027. It records the screening study as complete on December 22, 2023.

Queue ID25INR0547
Project nameIndigo solar 2
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Clayton - WShack Ckt 2
Point of interconnectionTap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2
CountyFisher
StateTX
Voltage345 kV
Capacity180 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-07-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Fisher, TX: 13 requests in the ERCOT queue, 13 active totaling 6,376 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityIndigo Solar 2
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-12-22
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.