Mud Cat Storage
ERCOT queue ID 25INR0507
Mud Cat Storage (25INR0507) is listed in the ERCOT interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Lamar County, TX. The filing names Hawk Hollow – Deport as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 18, 2029. It records the screening study as complete on January 16, 2024.
| Queue ID | 25INR0507 |
|---|---|
| Project name | Mud Cat Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Hawk Hollow – Deport |
| Point of interconnection | 11768 Hawk Hollow – 1768 Deport 138kV |
| County | Lamar |
| State | TX |
| Voltage | 138 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-09-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Mud Cat Solar, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-01-16 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.