Mud Cat Solar

ERCOT queue ID 25INR0505

Mud Cat Solar (25INR0505) is listed in the ERCOT interconnection queue as a 100.5 MW solar project in Lamar County, TX. The filing names Tap Hawk Hollow – Deport as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 18, 2029. It records the screening study as complete on January 16, 2024.

Queue ID25INR0505
Project nameMud Cat Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Hawk Hollow – Deport
Point of interconnectionTap 138KV 11768 Hawk Hollow – 1768 Deport
CountyLamar
StateTX
Voltage138 kV
Capacity100.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMud Cat Solar, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2024-01-16
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.