Happy Dog Storage

ERCOT queue ID 25INR0442

Happy Dog Storage (25INR0442) is listed in the ERCOT interconnection queue as a 104.5 MW battery project in Milam County, TX. The filing names Tap Hog Creek Switch – Bell County East Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 4, 2027. It records the screening study as complete on September 1, 2023, the full interconnection study as approved on September 16, 2026 and the interconnection agreement as signed on December 16, 2024.

Queue ID25INR0442
Project nameHappy Dog Storage
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Hog Creek Switch – Bell County East Switch
Point of interconnectionTap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch
CountyMilam
StateTX
Voltage345 kV
Capacity104.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-08-04
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Hog Creek Switch – Bell County East Switch substation: 2 requests in the ERCOT queue, 2 active totaling 190 MW.

Queue IDProjectMWResourceStatus
25INR0382HappyDogSolar85.5SolarSS Completed, FIS Completed, IA

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityRosula Storage LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-12-16
Screening study complete2023-09-01
Full interconnection study approved2026-09-16

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first