Stephens Ranch Wind Repower
ERCOT queue ID 25INR0439
Stephens Ranch Wind Repower (25INR0439) is listed in the ERCOT interconnection queue as a 12.4 MW wind project in Borden County, TX. The filing names Long Draw as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 1, 2027. It records the screening study as complete on September 20, 2023.
| Queue ID | 25INR0439 |
|---|---|
| Project name | Stephens Ranch Wind Repower |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Long Draw |
| Point of interconnection | 59900 Long Draw 345 kV |
| County | Borden |
| State | TX |
| Voltage | 345 kV |
| Capacity | 12.4 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2027-11-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Stephens Ranch Wind Energy, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | WIN |
| Technology code | WT |
| Screening study complete | 2023-09-20 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.