Pledgor BESS
ERCOT queue ID 25INR0405
Pledgor BESS (25INR0405) is listed in the ERCOT interconnection queue as a 100.3 MW battery project in Matagorda County, TX. The filing names Tap Gulftie – Pledger circuit 60 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 6, 2028. It records the screening study as complete on July 31, 2023 and the full interconnection study as approved on August 27, 2024.
| Queue ID | 25INR0405 |
|---|---|
| Project name | Pledgor BESS |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Tap Gulftie – Pledger circuit 60 |
| Point of interconnection | Tap Gulftie (43340) – Pledger (43120) circuit 60 |
| County | Matagorda |
| State | TX |
| Voltage | Not reported |
| Capacity | 100.3 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-04-06 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Pledgor BESS |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2023-07-31 |
| Full interconnection study approved | 2024-08-27 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.