Substation Scout

Pledgor BESS

ERCOT queue ID 25INR0405

Pledgor BESS (25INR0405) is listed in the ERCOT interconnection queue as a 100.3 MW battery project in Matagorda County, TX. The filing names Tap Gulftie – Pledger circuit 60 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 6, 2028. It records the screening study as complete on July 31, 2023 and the full interconnection study as approved on August 27, 2024.

Queue ID25INR0405
Project namePledgor BESS
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap Gulftie – Pledger circuit 60
Point of interconnectionTap Gulftie (43340) – Pledger (43120) circuit 60
CountyMatagorda
StateTX
VoltageNot reported
Capacity100.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-04-06
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPledgor BESS
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2023-07-31
Full interconnection study approved2024-08-27

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.