Stoneridge BESS

ERCOT queue ID 25INR0389

Stoneridge BESS (25INR0389) is listed in the ERCOT interconnection queue as a 101.9 MW battery project in Milam County, TX. The filing names Tap SANDOW SWITCH - AUSTROP CKT 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2026. It records the screening study as complete on June 9, 2023, the full interconnection study as approved on September 6, 2024 and the interconnection agreement as signed on April 19, 2024.

Queue ID25INR0389
Project nameStoneridge BESS
Status (as published)SS Completed, FIS Completed, IA
SubstationTap SANDOW SWITCH - AUSTROP CKT 2
Point of interconnectionTap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2
CountyMilam
StateTX
Voltage345 kV
Capacity101.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityStoneridge Solar, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-04-19
Screening study complete2023-06-09
Full interconnection study approved2024-09-06
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.