Stoneridge BESS
ERCOT queue ID 25INR0389
Stoneridge BESS (25INR0389) is listed in the ERCOT interconnection queue as a 101.9 MW battery project in Milam County, TX. The filing names Tap SANDOW SWITCH - AUSTROP CKT 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2026. It records the screening study as complete on June 9, 2023, the full interconnection study as approved on September 6, 2024 and the interconnection agreement as signed on April 19, 2024.
| Queue ID | 25INR0389 |
|---|---|
| Project name | Stoneridge BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap SANDOW SWITCH - AUSTROP CKT 2 |
| Point of interconnection | Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2 |
| County | Milam |
| State | TX |
| Voltage | 345 kV |
| Capacity | 101.9 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Stoneridge Solar, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-04-19 |
| Screening study complete | 2023-06-09 |
| Full interconnection study approved | 2024-09-06 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.