Substation Scout

Northington Solar

ERCOT queue ID 25INR0319

Northington Solar (25INR0319) is listed in the ERCOT interconnection queue as a 125.9 MW solar project in Wharton County, TX. The filing names The El Campo (#) - Pulsar (#) Line; AEP. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 14, 2028. It records the screening study as complete on May 19, 2023, the full interconnection study as approved on October 14, 2026 and the interconnection agreement as signed on October 2, 2024.

Queue ID25INR0319
Project nameNorthington Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationThe El Campo (#) - Pulsar (#) Line; AEP.
Point of interconnectionThe 138 kV El Campo (#8102) - Pulsar (#8192) Line; AEP.
CountyWharton
StateTX
Voltage138 kV
Capacity125.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-03-14
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityNorthington Solar, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2024-10-02
Screening study complete2023-05-19
Full interconnection study approved2026-10-14
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.