TOCE BESS 1

ERCOT queue ID 25INR0293

TOCE BESS 1 (25INR0293) is listed in the ERCOT interconnection queue as a 205.2 MW battery project in Wharton County, TX. The filing names Danevang Switching Station (Bus# ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on January 10, 2024, the full interconnection study as approved on November 7, 2024 and the interconnection agreement as signed on December 30, 2024.

Queue ID25INR0293
Project nameTOCE BESS 1
Status (as published)SS Completed, FIS Completed, IA
SubstationDanevang Switching Station (Bus# )
Point of interconnection138 kV Danevang Switching Station (Bus# 5546)
CountyWharton
StateTX
Voltage138 kV
Capacity205.2 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTOCE BESS 1, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-12-30
Screening study complete2024-01-10
Full interconnection study approved2024-11-07
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.