Hide Town Energy Storage
ERCOT queue ID 25INR0287
Hide Town Energy Storage (25INR0287) is listed in the ERCOT interconnection queue as a 102.8 MW battery project in Scurry County, TX. The filing names Union Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 11, 2029. It records the screening study as complete on April 14, 2023.
| Queue ID | 25INR0287 |
|---|---|
| Project name | Hide Town Energy Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Union Switch |
| Point of interconnection | 18555 Union Switch 138 kV |
| County | Scurry |
| State | TX |
| Voltage | 138 kV |
| Capacity | 102.8 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-10-11 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Hide Town Energy Storage LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2023-04-14 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.