Hide Town Energy Storage

ERCOT queue ID 25INR0287

Hide Town Energy Storage (25INR0287) is listed in the ERCOT interconnection queue as a 102.8 MW battery project in Scurry County, TX. The filing names Union Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 11, 2029. It records the screening study as complete on April 14, 2023.

Queue ID25INR0287
Project nameHide Town Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationUnion Switch
Point of interconnection18555 Union Switch 138 kV
CountyScurry
StateTX
Voltage138 kV
Capacity102.8 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-11
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHide Town Energy Storage LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2023-04-14

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first