Nockenut Springs Solar 5 (25INR0280) is listed in the ERCOT interconnection queue as a 201.2 MW solar project in Gonzales County, TX. The filing names Tap Elm Creek - South Texas Project as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 5, 2029. It records the screening study as complete on May 8, 2023.

Queue ID25INR0280
Project nameNockenut Springs Solar 5
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Elm Creek - South Texas Project
Point of interconnectionTap 345 kV 5133 Elm Creek - 5915 South Texas Project
CountyGonzales
StateTX
Voltage345 kV
Capacity201.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-06-05
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Gonzales, TX: 8 requests in the ERCOT queue, 7 active totaling 1,171.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPecan Springs Energy, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2023-05-08
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.