City Breeze BESS
ERCOT queue ID 25INR0271
City Breeze BESS (25INR0271) is listed in the ERCOT interconnection queue as a 143.1 MW battery project in Matagorda County, TX. The filing names MAGILL4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 18, 2027. It records the screening study as complete on March 11, 2023, the full interconnection study as approved on June 2, 2026 and the interconnection agreement as signed on May 15, 2024.
| Queue ID | 25INR0271 |
|---|---|
| Project name | City Breeze BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | MAGILL4A |
| Point of interconnection | 8111 MAGILL4A 138KV |
| County | Matagorda |
| State | TX |
| Voltage | 138 kV |
| Capacity | 143.1 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-03-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | City Breeze BESS LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-05-15 |
| Screening study complete | 2023-03-11 |
| Full interconnection study approved | 2026-06-02 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.