City Breeze BESS (25INR0271) is listed in the ERCOT interconnection queue as a 143.1 MW battery project in Matagorda County, TX. The filing names MAGILL4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 18, 2027. It records the screening study as complete on March 11, 2023, the full interconnection study as approved on June 2, 2026 and the interconnection agreement as signed on May 15, 2024.

Queue ID25INR0271
Project nameCity Breeze BESS
Status (as published)SS Completed, FIS Completed, IA
SubstationMAGILL4A
Point of interconnection8111 MAGILL4A 138KV
CountyMatagorda
StateTX
Voltage138 kV
Capacity143.1 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-03-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCity Breeze BESS LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-05-15
Screening study complete2023-03-11
Full interconnection study approved2026-06-02
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first