Isaac Solar

ERCOT queue ID 25INR0232

Queue ID25INR0232
Project nameIsaac Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationConoco
Point of interconnection8114 Conoco 138kV
CountyMatagorda
StateTX
Voltage138 kV
Capacity50.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-04-15
Source datasetlarge

Additional filed fields

Interconnecting EntityIndustrial Bravo Project LLC
Cdr ZoneCOASTAL
Fuel CodeSOL
Technology CodePV
Ia Signed45217
Screening Study Complete44960
Fis Approved46009
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.