Isaac Solar
ERCOT queue ID 25INR0232
| Queue ID | 25INR0232 |
|---|---|
| Project name | Isaac Solar |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Conoco |
| Point of interconnection | 8114 Conoco 138kV |
| County | Matagorda |
| State | TX |
| Voltage | 138 kV |
| Capacity | 50.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-04-15 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Industrial Bravo Project LLC |
|---|---|
| Cdr Zone | COASTAL |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45217 |
| Screening Study Complete | 44960 |
| Fis Approved | 46009 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.