Substation Scout

Burgos Solar

ERCOT queue ID 25INR0214

Burgos Solar (25INR0214) is listed in the ERCOT interconnection queue as a 105.5 MW solar project in Milam County, TX. The filing names Rookie Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of November 22, 2027. It records the screening study as complete on January 13, 2023 and the full interconnection study as approved on May 14, 2026.

Queue ID25INR0214
Project nameBurgos Solar
Status (as published)SS Completed, FIS Completed, No IA
SubstationRookie Switch
Point of interconnection3701 Rookie Switch 138 kV
CountyMilam
StateTX
Voltage138 kV
Capacity105.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-11-22
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTwin Oaks Solar, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2023-01-13
Full interconnection study approved2026-05-14
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.