Substation Scout

Shadow Ranch Solar

ERCOT queue ID 25INR0207

Shadow Ranch Solar (25INR0207) is listed in the ERCOT interconnection queue as a 807.6 MW solar project in Upton County, TX. The filing names 842 King Mountain as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2030. It records the screening study as complete on January 12, 2023.

Queue ID25INR0207
Project nameShadow Ranch Solar
Status (as published)SS Completed, FIS Started, No IA
Substation842 King Mountain
Point of interconnection842 King Mountain 345kV
CountyUpton
StateTX
Voltage345 kV
Capacity807.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2030-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Upton, TX: 22 requests in the ERCOT queue, 18 active totaling 5,611.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLectricWind LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-01-12
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first