Substation Scout

Nockenut Springs Solar 4

ERCOT queue ID 25INR0193

Nockenut Springs Solar 4 (25INR0193) is listed in the ERCOT interconnection queue as a 201.2 MW solar project in Gonzales County, TX. The filing names The Elm Creek - South Texas Project Line (Bus # - #) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 5, 2029. It records the screening study as complete on December 13, 2022.

Queue ID25INR0193
Project nameNockenut Springs Solar 4
Status (as published)SS Completed, FIS Started, No IA
SubstationThe Elm Creek - South Texas Project Line (Bus # - #)
Point of interconnectionThe 345 kV Elm Creek - South Texas Project Line (Bus #5133 - #5915)
CountyGonzales
StateTX
Voltage345 kV
Capacity201.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-06-05
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Gonzales, TX: 8 requests in the ERCOT queue, 7 active totaling 1,171.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPecan Springs Energy, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2022-12-13
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.