Legato BESS
ERCOT queue ID 25INR0184
Legato BESS (25INR0184) is listed in the ERCOT interconnection queue as a 202.7 MW battery project in Wise County, TX. The filing names #608 Crafton Substation - #620 Bowie Substation as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 24, 2028. It records the screening study as complete on December 21, 2022 and the full interconnection study as approved on September 12, 2024.
| Queue ID | 25INR0184 |
|---|---|
| Project name | Legato BESS |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | #608 Crafton Substation - #620 Bowie Substation |
| Point of interconnection | 138kV #608 Crafton Substation - #620 Bowie Substation |
| County | Wise |
| State | TX |
| Voltage | 138 kV |
| Capacity | 202.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-04-24 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Wise, TX: 11 requests in the ERCOT queue, 10 active totaling 3,798 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Legato Storage, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2022-12-21 |
| Full interconnection study approved | 2024-09-12 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.