Piedra BESS

ERCOT queue ID 25INR0169

Piedra BESS (25INR0169) is listed in the ERCOT interconnection queue as a 103.7 MW battery project in Freestone County, TX. The filing names Tap 345-kV line Navarro – Limestone as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 1, 2027. It records the screening study as complete on November 30, 2022, the full interconnection study as approved on September 18, 2025 and the interconnection agreement as signed on July 2, 2024.

Queue ID25INR0169
Project namePiedra BESS
Status (as published)SS Completed, FIS Completed, IA
SubstationTap 345-kV line Navarro – Limestone
Point of interconnectionTap 345-kV line Navarro (68091) – Limestone (46020)
CountyFreestone
StateTX
VoltageNot reported
Capacity103.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPiedra Solar, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-07-02
Screening study complete2022-11-30
Full interconnection study approved2025-09-18
Air permitNot Required
Water availability2025-09-19

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.