Piedra BESS
ERCOT queue ID 25INR0169
| Queue ID | 25INR0169 |
|---|---|
| Project name | Piedra BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap 345-kV line Navarro () – Limestone () |
| Point of interconnection | Tap 345-kV line Navarro (68091) – Limestone (46020) |
| County | Freestone |
| State | TX |
| Voltage | Not reported |
| Capacity | 103.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Piedra Solar, LLC |
|---|---|
| Cdr Zone | NORTH |
| Fuel Code | OTH |
| Technology Code | BA |
| Ia Signed | 45475 |
| Screening Study Complete | 44895 |
| Fis Approved | 45918 |
| Air Permit | Not Required |
| Water Availability | 45919 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.