Dolce BESS
ERCOT queue ID 25INR0139
Dolce BESS (25INR0139) is listed in the ERCOT interconnection queue as a 100.7 MW battery project in Mitchell County, TX. The filing names Tap BARBER_LK1_8 - CHINAGRVX2_8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of January 31, 2029. It records the screening study as complete on December 21, 2022 and the full interconnection study as approved on February 26, 2026.
| Queue ID | 25INR0139 |
|---|---|
| Project name | Dolce BESS |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Tap BARBER_LK1_8 - CHINAGRVX2_8 |
| Point of interconnection | Tap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8 |
| County | Mitchell |
| State | TX |
| Voltage | 138 kV |
| Capacity | 100.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-01-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Dolce BESS, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2022-12-21 |
| Full interconnection study approved | 2026-02-26 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.