Vial BESS
ERCOT queue ID 25INR0122
Vial BESS (25INR0122) is listed in the ERCOT interconnection queue as a 135.2 MW battery project in Hill County, TX. The filing names Chatt(234) - Pecan Street as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of September 15, 2027. It records the screening study as complete on October 1, 2022 and the interconnection agreement as signed on August 4, 2025.
| Queue ID | 25INR0122 |
|---|---|
| Project name | Vial BESS |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Chatt(234) - Pecan Street |
| Point of interconnection | Chatt(234) - Pecan Street (3352) 138kV |
| County | Hill |
| State | TX |
| Voltage | 138 kV |
| Capacity | 135.2 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-09-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Completed, FIS Completed, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Gransolar Texas Eleven LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-08-04 |
| Screening study complete | 2022-10-01 |
| Air permit | Not Required |
| Water availability | 2025-08-18 |